How a HomeHuge project runs
One company measures, draws, prices, and builds, under one contract. Here is what happens in each phase, who you deal with, and what you get in writing along the way.

The three phases of a project
Each phase ends with something on paper: drawings and a signed price, then weekly updates, then a certificate and as-built drawings.
Everything is drawn, priced, and permitted before anyone opens a wall.
- Consultation
- Free, in your home. A designer walks the house with you, asks how the family uses each room, measures the ones that feel tight, and gives you a budget range before leaving.
- Design phase
- Measured drawings, two layout options, and finish selections. A flat fee of $1,800, or $3,500 for whole-home and additions (proposed), credited in full to the build.
- Permits
- We draw to your local code, file the permit set, and answer the building department’s questions. The fees are a line on your bid.
- Fixed price
- The design phase ends with one price for the whole build, split into scope, permits, haul-off, and allowances, each task priced on its own. You sign it before demolition, and the schedule is set then.
One person runs the job, and you hear from them in writing every week.
- One project lead
- The same person runs your job from demolition to the walk-through, and is the one you call.
- Weekly written update
- Every Friday: what got done, what happens next week, and any decision we need from you.
- The change-order rule
- Nothing changes until it’s written, priced, and signed by you. If we open a wall and find rot, you see the fix and its price before the crew does it.
- Inspections
- We book each inspection the code calls for. Walls stay open until the inspector signs off.
- Daily site checks
- At the end of every day the site is swept, tools are put away behind the dust wall, and the house is locked.
You get the room, and the paperwork that explains it.
- Walk-through
- You and the project lead walk every room with a list. Anything not right goes on it and gets fixed.
- Certificate of completion
- Issued once the list is done and the final inspection has passed.
- As-built drawings
- Drawings of what is now behind the new walls: where the pipes, wires, and beam actually went, for whoever opens them next.
- Two-year workmanship warranty
- In writing (proposed). If something we built fails because of how we built it, we come back and fix it.
A sample bid, and the change-order rule
The fixed price arrives as a bid you can hold up against anyone else’s: scope, permits, haul-off, and allowances, each task with its own price.
The change-order rule
Nothing changes until it’s written, priced, and signed by you. Go over an allowance, or find rot behind a wall, and you see the change and its price before the crew does it.
| Scope | |
|---|---|
| Remove kitchen and dining wall, set a beam | $12,400 |
| Move plumbing, wiring, and the range vent | $10,800 |
| Install cabinets and counters | $4,200 |
| Patch and refinish the floor | $6,300 |
| Drywall, trim, and paint | $5,400 |
| Permits | |
| Permits and inspections | $2,900 |
| Haul-off | |
| Dumpster and debris removal | $1,600 |
| Allowances | |
| Cabinets allowance | $13,500 |
| Counters allowance | $5,800 |
| Fixtures and lighting allowance | $2,400 |
| Tile allowance | $1,800 |
| Project total, fixed before demolition | $67,100 |
| Design fee already paid, credited | −$1,800 |
| Balance after design credit | $65,300 |
Living in the house during the work
Most families stay home through a kitchen, a bath, or an addition. We plan the job around that from the first drawing.
- A dust wall with a zipper door closes off the work area, and floors on the way in are covered.
- A posted weekly schedule says which days the crew is there and which rooms are off limits.
- Kitchens: a temporary counter, the fridge, and a microwave move to another room.
- Baths: if you have only one, the days without water are named in advance.
- Whole homes: most families move out for the middle stretch, when kitchen and baths are down together.
- Text alerts, if you opt in: the crew’s arrival window for the day, schedule changes, and inspection updates on your project.
Permits and inspections
We pull the permits. That means we draw the plans to code, file them with your building department, answer its questions, and pay the fees, which sit on their own line in your bid so you can see them.
Most projects need a building permit. Moving plumbing or wiring usually adds trade permits, and an addition or ADU may need a zoning review first.
Then we book the inspections the permit calls for, usually framing, rough plumbing and electrical, insulation, and a final. Walls stay open until the inspector signs off, and the final sign-off comes with your certificate of completion.
How long a city takes to issue a permit is out of our hands. It is one reason we never promise a finish date before we’ve seen the house.
Book a consultation
Phase one starts with a free walk-through. A designer measures the rooms that feel tight and gives you a budget range before leaving.
Book a consultation